PATRICK ALAN KEARNS, P.E., C.E.M., LEED AP BD+C
P.O. Box 20364, Boulder, Colorado 80308-3364
Phone: (303) 918-8731
Email: kearnspa@earthlink.net
OBJECTIVE
A Project Engineering/Management position with emphasis in electrical systems and/or sustainable design
SKILLS
• Electrical Design
• Proposal Writing
• System Modeling
• Project Management
• Fault Studies
• SCADA system design
• Equipment Specification • Network Design (RF, fiber) • Bid Preparation/Evaluation
• Feasibility Analysis
• Bid & Construction Drawing
• Energy Analysis
• Vendor Evaluation • Software Development • Data Collection & Analysis • Workflow/Process Analysis
OPERATING SYSTEMS AND TOOLS
Oper. Systems: Development Tools: Drawing/Map Tools: Engineering Tools:
UNIX/Solaris MS Access
Linux
Visual Basic
MapObjects
AutoCAD
MS Visio
Windows NT Visual Basic for Apps ArcGIS
Windows XP SQL Server
Windows Vista C/C++
Windows 7
ArcExplorer
Google Earth
MapInfo
EDUCATION
M.S., Civil Engineering, Building Systems Program, University of Colorado, Boulder, Colorado, Dec. 2010
Master’s Project: Residential Energy Analysis: Regression Analysis of Heating Degree Days with Temperature
Setback for Selected ASHRAE Climate Zones
Key Coursework: Renewable Systems, Distributed Generation, Lighting, HVAC Controls, and GIS
M.S., Telecommunications, Interdisciplinary Telecom. Program, University of Colorado, Boulder, Colorado
Key Coursework: Cable, Data Communications, Wireless Communications, Satellite Communications
B.S., Electrical Engineering, Portland State University, Portland, Oregon
Senior EE Electives: Communication Systems, Electrical Energy Systems (Power), Power Electronics
Semi-fluent in German, Spanish
LICENSES AND CERTIFICATIONS
Registered Electrical Engineer in the States of AZ, CA, CO, HI, ID, NM, OR, UT, WA, and WY
Certified Energy Manager (C.E.M.)
LEED Accredited Professional BD+C (v3.0)
Completed NABCEP PV certification class work
PROFESSIONAL EXPERIENCE
Ash Group, Denver, Colorado
August 2012 – Present
Substation Engineer
• Supported GIST2 Smart One Line project
• Prepare and reviewed facility ratings
• Reviewed and checked one-line diagrams and other site documents for NERC FAC-008/009 ratings compliance
• Configured GE D20 RTUs and prepared ladder logic programming for Automatic Throw-Over (ATO) schemes
• Developed VBA macros to calculate facility ratings and manage equipment lists
• Imported TMY2 and TMY3 data into tables; performing ongoing statistical analysis for determination of suitable
ambient conditions to be used in NERC FAC-008 facility ratings methodology
• Prepared technical standards and design guidelines for SCADA and substation communications equipment
• Reviewed engineering tools, standards, and guidelines
Page 1 of 3
AGI32
eQUEST
RETScreen
Commcheck
PV Syst
HOMER
Office Tools:
MS Word
MS Excel
MS Outlook
MS PowerPoint
MS Publisher
MS Project
Patrick Alan Kearns, P.E., C.E.M., LEED AP BD+C
Phone: 303-918-8731
Revolusun, Honolulu, Hawaii
June 2011 – Feb. 2012
Electrical Engineer
• Prepared and reviewed project proposals and energy production estimates
• Performed electrical system design (e.g. stringing, one and three-line, module layout, relays)
• Performed engineering analysis of electrical systems (e.g. loading, fault studies, voltage drop, etc.)
• Analyzed field energy production data
• Performed site walks and field surveys
• Reviewed site feasibility analysis and regulatory impacts; reviewed HECO interconnection agreements
• Prepared permit and construction drawings and submittals
• Tracked building permits and coordinated with permitting agencies and building subcontractors
Nexant, Boulder, Colorado
Jan. 2007 – May 2011
Senior Project Engineer
• Prepared and reviewed project proposals and engineering estimates
• Prepared white papers and technical feasibility studies for new technologies
• Performed mechanical and electrical system commissioning
• Performed energy analysis and GHG emissions calculations for various commercial facilities
• Modeled equipment operation and characterized energy savings
• Performed energy audits of various commercial, manufacturing, and industrial facilities
• Supported sustainable design analysis for LEED certification
• Supported and assisted in development of utility demand-side management programs
• Performed pre- and post-retrofit field inspections for electric utilities
• Performed measurement and verification (M&V) of various commercial and industrial equipment retrofits
• Designed VBA-coded audit spreadsheet used to estimate energy savings for ECMs at commercial facilities
• Designed and supported energy savings project tracking database for Colorado Governor’s Energy Office using
Access; database fully coded and includes 15+ forms and 25+ tables
• Designed tracking database used in evaluation of grant applications for renewable and energy efficiency
projects
Architectural Energy Corporation, Boulder, Colorado
May 2006 – Sept. 2006
Intern Engineer (half-time)
• Performed field installation, testing, and troubleshooting for 2006 Xcel Energy Saverswitch Program
• Performed spot power measurements using Fluke power meter
• Downloaded and tracked data for further analysis
Front Range Technical Solutions, L.L.C., Boulder, Colorado
President
Aug. 2002 – Dec. 2006
Performed contract work for various clients. Examples: ATECS LLC, S2E Engineering, and PCD Engineering
• Performed RF emissions analysis for wireless communication sites
• Performed electrical, lighting, communications & control design for various commercial and residential facilities
• Prepared electrical permit drawings
• Performed site walks and surveys
• Coordinated with permitting agencies and building contractors
• Coordinated with utility service providers
• Prepared bid documents, engineering reports, construction drawing packages using AutoCAD, and proposals
• Performed field inspection of job sites
Washington Group International, Denver, Colorado
March 2002 – May 2005
Electrical Engineer
• Performed electrical, lighting, and controls design for various airports (general aviation and commercial) and
commercial facilities (e.g. airfield lighting, airfield equipment buildings, office buildings, apron floodlighting,
navigational/instrumentation systems, weather sensor systems, security systems, de-icing system)
• Reviewed and approved electrical drawings and specifications for bid and construction
• Performed engineering analysis of electrical systems (e.g. loading, fault studies, voltage drop, etc.)
Page 2 of 3
Patrick Alan Kearns, P.E., C.E.M., LEED AP BD+C
Phone: 303-918-8731
• Performed construction management of contractors
• Prepared technical specifications for electrical, lighting, security, and communications equipment
• Also prepared bid documents, engineering reports, construction drawing packages, and contract documents
Qwest Wireless/U S WEST Wireless, L.L.C., Denver, Colorado
Jan. 1997 – June 2001
Lead Wireless Engineer
• Provided engineering support to all Qwest PCS markets for regulatory issues, interference studies, and other
RF issues (e.g. performed initial cell design of Northern Arizona Ericsson market).
• Enhanced network growth and in-building models which forecast equipment and capital expenditures.
• Managed programmers to develop and maintain several distributed VB applications for RF field engineers.
Windows applications successfully deployed included Hotspot (copyrighted by Qwest) for RF exposure
calculations, RF Toolkit (general RF calculations), antenna isolation calculations, and cell site management.
• Chaired and coordinated project meetings to establish consensus and build relationships with field personnel.
• Evaluated antenna, repeater, and base station equipment for eventual deployment on network.
• Validated performance of Ericsson 7.5 FOA load on network switch in PCSAN (open architecture) network.
PCS RF Engineer
• Provided design/optimization support for successful launch of CDMA network in Portland market. The major
duties included: making site recommendations; performing site walks; evaluating/verifying RF coverage and
performance; evaluating drive tests; selecting final sites; calculating RF emissions; evaluating traffic patterns.
• Reviewed site drawings and construction packages for electrical details (grounding, antennas, UPS, etc.).
• Maintained accurate site documentation and tracked site status to ensure timely deployment.
• Prepared presentations for city councils and neighborhood associations to aid in zoning authorization.
Laboratory Test Engineer
Aug. 1995 - Aug. 1996
• Prepared test plan for OC-12 optics card; presented results and recommendations to management.
• Performed laboratory testing of optics card on Fujitsu FLM-150 SONET Add/Drop Multiplexer using OC-12 test
set, T-BERD, fiber power meter, etc. Battery of tests included functional, provisioning, logical layer and physical
layer tests.
• Provided tours of Network Integration Lab for other interns to aid in understanding of network architecture.
• Designed outside plant facilities (OSP) for business/residential customers and issued plans to field installers.
• Prepared and submitted drawings using CIMAGE, LFACS, and other software tools.
• Prepared and issued cost estimates for engineering jobs to field installers.
• Attended training on telephone network architecture, fiber in the loop, and USWC engineering standards.
Pacific Engineering Corporation, Portland, Oregon
May 1991 - Aug. 1995
Consulting Electrical Engineer
• Performed electrical project work for substation, transmission, generation (hydro), and communications facilities
• Surveyed and documented network facilities (copper, fiber, etc.)
• Designed, prepared, and submitted circuit schematics, block & level diagrams, and wiring diagrams for various
voice and data circuits (alarms, status, SCADA, telemetry), multiplexed into D4 channel banks.
• Prepared bid packages, bid evaluations, construction drawing packages (one-line diagrams, plan/elevation, bills
of materials, etc.) and purchase documents.
• Prepared technical specifications for high-voltage electrical, mechanical, and communications equipment (e.g.
power transformers, capacitor banks, motors, etc.)
• Performed engineering studies (e.g. load flow, grounding, fault) using Dapper/Captor to properly size conductors
and fuses.
Page 3 of 3